Case Studies
Charles Day Steels – Industrial
Identification and labelling of components meaning machine downtime and bottleneck of company workflow
Significant time and cost savings. Minimal alterations to procedures, significant reduction in production bottleneck.
SGS Quay Pharma – Pharmaceutical
Safe way of preventing needle sticks needed on a repeating manual task
Product designed and manufactured that has meant no needle stick injuries have occurred throughout production.
Elemental Objects – Consumer products
Air rifle accessories such as spare magazines are costly, difficult to produce, with long lead times from suppliers
Significantly better range of stock now available, which performs better than OEM parts. Stock supply more consistent and better priced.
Ethypharm – Pharmaceutical
Damaged parts causing
lengthy downtimes (weeks to
months), with significant costs
Turnaround by Addition
was just 72 hrs.
Replacement parts were
back on the machine within
only 4 days.
Chester Medical – Pharmaceutical Packing
Use of fixed size parts was limiting the range of packaging options they could offer to customers
Addition’s redesign, allowing for production of a wider range of packing sizes, means a greater value of product, and improved profit